The most important objective is to ensure that the home is safe for occupancy and that all systems are operating correctly.
Certificate of final electrical inspection requirements.
Issued on and the same were found completed in accordance with the approved plans and specifications on file with the office of.
Bir certificate of registration form 2303 4.
Truss certs and whatnot were submitted with the framing inspection so that s covered.
It is not possible to know exactly what the inspector will check.
Pay the required bill deposit as reflected in the approved inspection sheet 9.
What is an occupancy permit.
It is required that the customer or a representative is available on site during service energization.
Meralco will perform a final inspection before installation of meter.
Proof of occupancy documents.
Tax identifications documents e g.
This inspection is called the final inspection at this point all of the walls are closed in painting is finished floors are complete and you are ready to install the furniture.
As built electrical plan signed and sealed by the pee 5.
Form 16 seems as best as i can tell to be a qld requirement i did manage to find a final inspection certificate checklist from a gippsland council region that was purely about health safety and amenity.
Based on the national building code nbc new schedule of building permit fees and other charges about the service.
The certificate of final electrical inspection cfei is required prior to the actual occupancy of the building.
One 1 government issued id.
The second inspection takes place when the house is complete but before you are allowed to begin using the space.
Secure certificate of final electrical inspection completion from obo.
Submit the certificate of final electrical inspection completion and other requirements with proof of identity at our service centers in sm city ecoland and sm lanang premier 8.
Application of certificate of final electrical inspection cfei fees.
Xxx view an example of an occupancy permit or certificate of final inspection.
Renewals or extensions of this certificate of final electrical inspection cfei are subject to inspection and payment of corresponding fees in conformity with pertinent provisions of the latest philippine electrical codes the national building code p d.
Certificate of final electrical inspection.
This is a government requirement.
Certificate of final electrical inspection cfei is acquired at the city s building administrator s office or city engineering s office.
Check each of the following items prior to inspection.
Process your cfei at the city engineer s office.
This checklist will help accomplish that objective.
The purpose of the certificate of final inspection is to identify a start date for the liability period for building faults.
Certificate of final electrical inspection completion this is to certify that final inspection of the electrical installation has been conducted on the bulding and or premises covered by building permit no.